OCR Text |
Show of the amount of the bid, made payable to the order of the Board of Education, Nebo School District and shall be sealed and filed with the Clerk of said Board in Spanish Fork, Utah, on or before November No-vember 5, 1962, at 5:00 p.m. at which time they will be opened and publicly read aloud. Bid opening shall be in the New Spanish Fork High School 3rd West and 1st North in Spanish Fork, Utah. The above mentioned check or bond shall be given as a guarantee that the bidder will enter into the contract if awarded to him and will be declared forfeited if the successful suc-cessful bidder refuses to enter into said contract after being requested to do so by the said Board within a period of thirty thir-ty (30) days. The said Board reserves the right to reject any or all bids or waive any informality in a bid. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof, unless otherwise other-wise authorized by the Owner. BOARD OF EDUCATION, Glade R. Stone, President, C. J. Wendel, Clerk-Treasurer. Published in the Springville Herald October 18, 25, 1962. ADVERTISEMENT FOB BEDS Notice is hereby given that the Board of Education, Nebo School District will receive bids for all the labor and materials ma-terials required in connection with the construction of -the Addition to the Spanish Fork High School located in Spanish Fork, Utah. Bids are to be submitted separately for the (1) General Work, which includes everything every-thing except the Plumbing, Heating and the Electrical Work; (2) Plumbing, Heating, and (3) Electrical Work. Bids are to be submitted in accordance accord-ance with the respective plans, specifications, and other contract con-tract documents now on file with the Board of Education, Nebo School District, Spanish Fork, Utah, and at the office of the Architect upon receipt of $50.00 per set, which deposit de-posit will be refunded providing provid-ing the bid is submitted in proper pro-per form and upon receipt of such copies in good condition within ten (10) days after the bids are opened, otherwise, the contractor will forfeit his deposit de-posit to the Architect. Bids shall be submitted in duplicate " for each contract. Each bid shall be made out on a form to be obtained at the office of the Architect, and shall be accompanied by a certified cer-tified or cashier's check or bid bond for five (5) per cent |