OCR Text |
Show OPERATIONS RESUMED ON BEAVER COPPER Excellent progress is being1 made at the Heaver Copper mine, which recently resumed operations, say officials of the company. The compressor is being- moved from the old shaft to the deep shaft. An ore-bear ins? fissure was struck in this shaft on the 270-foot level. A drift was then driven to the 470-foot level. At this paint a crosscut will be made to intersect the fissure again. The ore in this fissure, according- lo official information, carried good silver-lead values. - . i |