Show GRADING MOFFAT ROAD Contracts Awarded for Nine and a Half Miles From utah Junction Juncton TRIBUNE SPECIAL Denver Colo March 30 Contracts were let today for the grading of the line of the new Moffat road from Utah Junction where the road will connect lth the Joint C S and Burlington i tracks to Leyden Junction the present eastern terminus of the line The work covers nine and n half miles and was i let l Jointly to Clough Anderson of Colorado Springs and E C Phillips and It originally Intended Son of LonginnnU I wan tended that the trades of the Denver Northwestern the electric line would be used between Arvada and Leyden Junction saving about five Llen miles of separate construction I has been decided Instead to build an entirely en-tirely separate Hue for the steam road tlel 1ne nail hence todays grading contract wusj for nine and a half instead of four and j a half miles of work The Mount road will parallel the electric line from the wl point of contact near Arvada to the f coal banks at Leyden where the dec1 trio line has its terminus and the steam road veers oft toward Rollinsvllle and I the mountains |