| Show Work on New Mammoth Work upon the New Mammoth Mining Min-ing companys properties at Bingham Is to be resumed at once said Frank Knox by whom the proposition Is now controlled yesterday and the main tunnel now in over 1000 feet driven as speedily as possible to a connection with the vein from which some ores from the upper workings were milled True prosecution of this work will be under a contract with F H Luthrop as superintendent and since an exhaustive ex-haustive examination Mr Knox does not doubt that it will be with substantial sub-stantial results Indeed some very high grade ore was found along with those of milling quality In the original workings and connection with the vein upon Its dip will be awaited with a great deal of Interest by mining men |