Show THE electrolytic COPPER CO wyo march 20 in the moun tain in rest mine of the electrolytic copper coat this place a body of copper silver ore e was encountered recently on the see sec ad level in the work a new drift south from ing shaft sixty feet from the shaft and the ore is still of shipping grade at eighty five feet this drift crosscuts cross cuts the nearly at right angles and general samples talen taken tal en across twenty feet carry values of per cent copper 2640 ounces silverano silv silver erand and in gold these samples we from both sides and bottom of drifts and the ja la st t five feet is a richer ore at s point ark has been discontinued until tle e ore jan can be handled safely the company installed a hoisting plant last june and has been working a force of from eight to twelve men since that time the shaft on the property was ninety feet in depth when the company began operations and has been sunk deeper to the second level the shaft has disclosed a large body of fair ore and a goodly tonnage of this is blocked out ready to |