Show an important strike is reported from the new quincy property at park city utah it was made at a point about feet above the level of the daly west mine through which the work is being prosecuted A small crosscut was run from the main drift on the fissure in new quincy ground this broke into the beddings and superintendent harrington reports that for eighteen feet he has been in so sold id ore ten feet wide with neither wall in sight the product is said to average about 39 a ton shipments are to start at once |