Show SOUTH HECLA SHIPPING general manager george H watson of the south hecla mining alining company reports that shipping on a large scale is now under way from the companas comp anys property in the lietje cottonwood district utah about twenty five four horse outfits are engaged in the hauling the roads to the mine were cleared of snow last week and the management expects to send out at least two carloads of ore daily for an indefinite period the wedge oreb ore ody body previously developed velo ve loped on the and levels is now DOW being opened on the and is showing an improvement in the lead and copper values over the levels above development work on the level is going forward satisfactorily the main has been opened on the level for a distance of feet showing an average width of twenty five feet and developments on the level have proven it for about the sanie same length and width |