Show WILL RESUME AT ONCE Tintic Humboldt Mine Operations to toBe toBe toBe Be Pushed Rapidly Special to The Provo March 7 The Tintic Humboldt directors met here today and decided to resume work w rk on the mine in Tintic opera operations operations operations In which have been suspended dur during durIng during ing the winter months A whim and other machinery has been bought and Super Superintendent SuperIntendent Superintendent Taylor will begin work at once The shaft Is down 80 ro 8 feet and will be sunk to ISO feet when a drift will be run to catch the vein which was cut on the level and which showed good values In silver and lead Manager Andrew Madsen of the Tintic Delmar is 18 in with soma some fine gold quartz from the Delmar Work is being crowded on the tho property with most satisfactory results |