Show WORK ON T DAY Good Pay Ore Stck I the SnowStorm Snow-Storm Mercur March 4Work on the south incline at the South DaIsy will be commenced in a few and an dd dltonal force of men will be put on to crowd th development work I is the intention to haVe a mill ready within ninety days and to meet the requirements require-ments of the plant ever effort to increase in-crease the available body of are will be made A stIke of pay ore was made at the Snowstorm thIs week but little noise was made in relation to the mater un t it could be determIned whether the values were likely to keep up So far there has been no change but for the better ThE strike Was made In i drIft from the ZOOfoot level One of therea sons why values genera have been lott in thIs propery is that the incline is beIng run in the hanging wall and only at distances of about fifty feet crosscuts have been made to determIne deter-mIne values and thIckness of the veIn vaues The town of Rlshvie the name of th Snowstorm townsIte promises to be a lively little place Lots are goIng rapidly and a number of buildings have been contracted for Hurl Y Van Horn have taken a contract to put In a steam sawmill at the La CiSale to be used in sawIng timbers for square sets for the mine |