Show SALT SAt T LAKE RAILROAD WILL LOSE CONTRACT FOR CARRYING MAIL f Los Angeles Feb lo January f f floods which put the time Nevada dl di division f 4 vision of the time Salt Lake railroad f fout out of commission has cost that f f s system stem a contract with J 1 4 the time government for the transportation f 4 tation of transcontinental malls f f The estimated value alue of this con contract f 4 tract was annually 4 f Weighing of mails malls on the tue rail rall railroads f f roads of the time fourth contract see sec 2 f tion of uC the United States will be f 4 begun on February 17 As the Salt 4 I Lake ake road Is not operating f 4 through trains between Los An Angeles f 4 gales gelos and Salt gait alt Lake City CIt there 4 will be no weighing on that line 3 4 Contracts to be let on the basis of f f the weight of mail carried in the 4 f next few weeks will remain in lit 4 force until January 1 3 1914 4 4 1 t t i |