Show GLOWING REPORT I ION ON MASON V VALLEY ALLEY I Smelter Project Feasible Ex Expert Expert pert Recommends Walker i Lake Site I While the report on the Mason Val I Iley Icy ley mine by the C Canadian metallurgist I Is even better than Jules beter Jule En I had been predicted by Consulting Duncan MacVichie and Superintendent I Arentz of the Nevada Douglas i according to advices received In Yer YerIngton 1 Ington it Is said that he wilt recommend mend that I the proposed r ter be con constructed on a site near tie he head of Walker alker lake rather than e on the Wa Wabuska Wa Wabuska buska site sie which was selected by Ma Mason Maon son on Valey Valley management Mr Is quoted as saying that the tonnage In sight on the foot level of the Mason Valey Valley mine isalone Is Isalone alone sufficient to warrant the build Eng Ing of a smelter but he fears that to I the farming section as build It SO 50 near Wabuska would be to Invie invite litigation Heavy buying of Mason Valey Valley stock of Ly by Inside Interests and by the he mine Is said to have been the cause advance of prIces and of f the recent thIs Is taken to IndIcate that has as been correctly quoted as to the need of a smelter While there may maybe maye be e difference of opinion as to the most site for the plant It is I sie that that wi delay the start startIng Ing ng of construction work The o raises which are being driven from rom the lower levels of the Mason ason Val Valley Valey ley ey mine to the surface have reached the he second level as soon Boon as they are arc ready eady for use possibly by the first of the mine force wil will be doubled It Is said and the work of exploring the ore oro bodies at yet greater depth wil will be undertaken The Nevada Douglas Bluestone Western Vestern Nevada Malachite McConnell and other mines of the district are be beIng beng Ing ng placed In readiness for greaty greatly In Increased Teased creased as soon as the smelter plans lans shall be announced |