Show WILBERT WIBERT WIt REBUILD fl MILL AT Development Work Vork at Old Ole Payer I Before many mo months more mor u it tar peeled that th the tho Wilbert I t. t tha pany in itt the tho Domo Dome mining dl l allIes mileo from Arco Idaho will now mill ml in operation and wil b b ht r l lar bar shipper again On account Of o success of ot the tile experimental w w- w I has been attained in working tb tb from rom the property properly A A- A S. S Ro Ross and nt general mana manager er of ot tho the prel has gone gono rono east cost cat to complete completo te fin final for tor tho the building o of at i ton ty-ton mill i rl During a trip to tha crt crl erty last week Mr tr Ross Lep ranG for or the mine to mael at once with two shift a ing InS lie Ho also arranged for or the b haul ll of or a 3 large quantity of oC oil 01 to th tha tho- tho f for or the tho starting ot of f drills up UJ the m taj t t Upon his return to Salt Lake Lak Mi Mj had had a a. a thorough test made made of ot th tb eraSo grade low low ores at the mine crab cral hun hundred red pounds I erl of or rock rt t h cd out This averaged 21 lead 23 3 lel ounces silver and a tr n tre gold It col I was found that thai by t tiit t with jigs table and flotation th that thit tons concentrated Into one I b would be 1227 tons of at concetto from rom a mill with a mi capacity tons a da day I would make mako a conce u of or per cent cent lead and Gi o oui In silver This would r sl cr mean a ai ea fiT of per cent ent on the tha lead and per cent on the silver siver The tall bi showed Ved 12 1 per cent lead and 0 01 an ounce In silver jt The showing made was so 30 much ter than that made by tho time mae Old which burned down In S September r t 1 that It was decided to rebuild plant at at once Much of oC the was saved saed from the fire tre and cai tn s utilized f in the building of oC th the thel J mill mi The crushing department is Intact and it will wi only be Install jigs tables and flotation l chiner chinery The cost of or tho the plant will wil far Car less than was vas originally exper Un Under er the old method of ot treat tho savings were not what w was peeled and there 1 Is now non a dt which contains about abolt tons tons V dump 1 1 Is said to carry carr u 8 Ste to 10 O per p j Jounce ounce in silver sl er to 10 ton lon It I is probable that arrange will wi be made mado later laler for tho the re of ot this dump f Development work Is la being stion swon sty sti styon t on the tho big ore shoot that hasib developed de between the 70 00 ag level In this there Is plenty of or ore oro to Justify the tho er erot erect of ot the tho mill mi This ore body willmore will 1 more fully tuBy opened up at once once j Tho The property has bias an excellent to the SOO 00 level well wel timbered dj equipped with wih a good hoist hoist compre and pumps Besides that the com comp cemp ha has good buildings and equipment the accommodation of or the mon mODI When work ork was stop stopped cd on the the j level time the miners had been drifting i several hundred feet In low grade low gade and were about five seventy a contact which It Is believed ed belc W clop Into an ore oro body About I 1 beyond this Is another contact th tha th declared to bo be quite promising A Ah fl h rime Tho has shipped 1001 worth of ore oro and paid in Sif d 4 J |