Show Thirty Millions Aye Are In InSight at Walker Recent Visitor Declares Property Will Till Soon Have Tram Train Working Reducing Costs From 8 8 to 60 Cents Ton Tort TonA TortA A to 10 a recent visitor at the Walker Mining Mining property in Plumas ri county California the thc has in company the neighborhood of worth of ore in in sight sigh It is is declared that although the Places the gallic f of the ore at nt 4 per cent it is declared that it will ivill company compan nearer C 6 per pei coil cent and that although the width of the vein rein is given 16 it average feet fee as i it runs all nIl t the he way from lo 15 to 50 feet in width In he every the tIle amount of ore in in sight is easily as much is way says that as given in tho com corn I pany report In part lie hc says I The Tho Anaconda its ts report e r In Copper Coppe company Ia fn December I gave dimensions dimensions dimen- dimen ot of the te h V developed or ore body In feet Ceet the S Walker d Mining S Pr property as 3 In depth soo 16 fir feet teet Jn In width feet In length and AllowIng 10 io cubic feet teet to the tho ton w would uld show demonstrated demon- demon by actual and the value workings tons given this 8 was 4 per cent copper total and 3 In silver sHYer and gold iff or n a i value of the tho deposits on cent IG-cent COPPer ot of The report also gave Sav ave as demon demonstrated b by drills soo feet teet additional on this veIn which means an additional addi addi- tonnage ot of or of a a. value ot of This or a estimate grand total Is made ot of 14 on ground 1700 feet feat In length while the total territory Is feet teet In length and more than three fourths or of a mile mUo wide The entire n J The estate I Is r represented presented b by io tui patented claims claim and two placer claims Th The entire holdings holding are arc heavily Uy timbered estimated to be bethe worth for tor mining purposes as mUch as 1 I a share or tho price paid by the Anaconda company for tor the controlling Interest In iii the Walker The new drain tunnel being driven from the mill to the mine Is 18 now over 1000 feet and i la beIng cut b by power drUb drills Progress Is being made at the rate ot of 10 to 12 feet allowing for tor delays f 10 day dally and it is Js estimated not les less than feet leet per month that will bo be made Within the next MI 2000 feet teet this adit will ni cut the vein at a depth ot of below the which will present working gIve upwards of ot feet teet n of or r backs b on Uhe ithe vein There Thore is One ne win will and possibly be bo developed eloped tW two parallel veins ini that tha by this tunnel tn n experimental mill mi of or tons Capacity capacity ca- ca has been treating the ore dur duro In ing the winter Inter months and is making concentrates It at the tho rate of or fl five lI o into o one ono This product averages 20 per cent and 8 8 to 12 in gold and silver T EVen with this small mall capacity n Plant the output f is valued at considerably considerably consid consid- more than a year Tho Thc mine is sufficiently developed at present present pres pres- ent to produce three times this ton- ton nago and from Crom 2000 to tons tone of concentrates have havo accumulated at tho the mill mm and i are being beine hauled by trucks truck until the tramway to the railroad I is completed c ted X Nearly Rendy The tramway over eight miles In length extending from Crom the mine to the railroad station at Garden Springs California on the Western estern Pacific Pacific- Is nearing completion and practically all allot of ot tho the towers have been framed and are aro being erected The right of ot way S feet Ceet in width passing through h the great timber belt In California has been cleared Tho The tram will pass passOver passover S over o a range of mountains 1700 feet teet in Jn I hels The capacity will be tons tone I daB dally daily and reduce tho the hauling charge from irom 4 4 I to JS 8 per JOi ton the summer Bummer and winter rates respectively to Ci 60 cents a ton a and d possibly less This tramway will be bo completed before fall tall fallat fallat at a cost of ot about and will willbe willbe be able to handle worth of ore a month Last year year the company compan installed an electric power line fifteen miles In length connections being made wit with the Great Western estern Power plants pi ot t California All equipment at tho the mine and mill Is thus operated by electricity at a greatly g reduced cost over oer steam power loWer The cost for tor the installation was about Savings of from 90 to 97 per con conof cent of all the values value are being made bi bithe by bythe bytho the tho flotation proc process ss in use uso at the tha plant These high recoveries are mado made possible b by the fact that it is a a. primary primary mary ore oro that is treated making making- an ideal Meal concentration A A. much larger mill Is planned along the tho lines of ot the present experimental plant Arm Army has pounds surplus of food products according to General Genor l March who blames quartermaster quartermasters s corporations for not putting surplus on market |