Show NEVADA record ed F freudenthal has taken a bond from henry welland and joe foster on the victor mine which is situated situa tec northwest of the old alps mine ely news the smelter of the new york nevada copper company at the keystone is rapidly nearing completion and will be in operation upon the ores from the copper flat mines before the close of two months ely news at the pilot knob mines a force of fifteen men are engaged in continuing the drifts from the foot level sinking of the main shaft can not be resumed until the arrival of much heavier machinery in the way of a boiler engine and pumps pioche record locators are taking up all vacant ground around the point four miles west of town where henry welland and clifford have recently made such a good showing on lead ore the ground thereabouts has been located and abandoned a dozen times by as many different parties in the past thirty years tonopah miner the double compart ment shaft of the tonopah mt butler gold mining company is down forty five feet A road is being constructed to the shaft so that the machinery now en route may be hauled to the mine mind As soon as the machinery is placed in position the work of sinking to depth will be energetically getic ally pushed winnemucca silver state the adelaide mining company is about to resume operations since the advance in the price of copper and the splendid outlook for still better prices this company has concluded to take out considerable copper from t their air mines the advance has also caused several other mine owners to commence preparations pa rations for copper mining ely news at the ruth developments are malting making rapid progress the cutting out of the station and two drifts on the level having been accomplished the main shaft is now dropping down in a good grade of copper ore at the pace of six feet a day if no further obstacles occur the level will be reached by the last of the month when something good in the way of ore can reasonably be anticipated ely news the resumption of work on the sinking of the shaft at the mckinley companas comp anys saxton has been delayed while the larger hoisting engine is being placed in position this will be accomplished in the next few days and the first of next week will see the shaft going beyond the foot level in the meantime developments will be carried forward in the different erent e r en t d drifts on the levels above where con arable rable gold and copper ore is now ex |