Show WIDE IE DIFFERENCE IN BIDS Range of in Estimates on the Cost of Installing Pumping Station The board of public works last evening opened three bids for the installation of ofa a pumping station at Eighth West and Seventh North streets to pump the sew sewerage sewerage sewerage from the new Intercepting sewer into the old gravity sewer seer The bids In Include include clude elude the price of installing two pumps an electric motor and a gasoline engine with alt all appliances connected therewith They were as follows Fairbanks Morse Co Salt Lake Hardware company Charles C Moore Co The bids together with the plans sub submitted submitted submitted by b the respective bidders were submitted to the city engineer and the board will meet again Monday afternoon to consider the award The bids bide do not include the building of ot a pump house or orthe orthe orthe the connection between the two sewers which Is to be made by wooden stave pipes These contracts will be let later |