Show GARFIELD BEACH Some of the Changes IVIiirli arc to be Made The carpenters at work at Garfield Beach is fast Hearing completion The framing work of the piers covering is finished and needs only to bo put together After the carpenters are released from this portion of the building they will be set to work constructing a large number of lattice summer houses which are to be distributed around the grounds and also to build a platform 1350 feet long by 20 feet wide This platform will connect Garfield Beach with Garfield Landing Land-ing The old pier is to be made into a shooting gallery with three departments I There is strong talk of placing some i i plush reclining chairs on the floor of the i observatory which will be rented out by i the day This will no doubt bo a grand feature Who would not forfeit a reasonable j reason-able sum for the days ownership I of a reclining chair in an observatory such as this place I affords The chairs talked of are to be a kind that will fold up and be locked so with a key This will lend perfect oafety to the owner who mav I choose to leave his chair for a time arid find reserved when he returns The t If double back rooms for the use of families are furnished as conveniently as the rest with the addition of a connecting door The bathing suits which have just been received from the East and those extra large furnished by the Deseret Woolen Manufactory are just what the public have wanted for a long time The ladies suits are as beautiful as any ever seen in this city they are of all sizes and kinds and the wholesale figures of the majority could not have fallen short of 5 They are principally blue sailor style and trimmed with white braid The grand opening day which is now postponed until un-til the 28th inst will be one of wonder surprise and happiness to those who take advantage of the opportunity |