Show Metals Building Move Begins Next Monday Monday The Welding and Machine Shop classes classes' equipment will be moving into the Metals Building on the Main Campus next week This building was completed about six weeks ahead of schedule and it was quite an accomplishment according Building and Grounds Joseph L L. L Johnson Moving the heavy equipment from the Downtown Campus Campus' is expected to take a large part of next week Students in the Welding and Machine Shop classes are expected expected expected ted to concentrate on related training while the move takes place The Metals Building is a beautiful structure and were we're very very proud of it said College President Jay L. L Nelson Featured in the building is a second floor walkway walk which permits permits permits per per- mits visitors to watch students at work york without disturbing them by entering the classrooms In those classrooms will win b be plenty of new equipment One item will be a tape-controlled tape milling machine for the Machine Ma chine Shop students Welding positions are built in into into in- in to tOI the walls with gas and water wa water w ter plumbed into o each position First students to use the n new w building will win be the summer quarter students and persons enrolled enrolled en en- rolled in the Hill Field sheet metal program Besides Welding Machine Shop and Sheet Metal classes Utah Technical College will als also operate a an Air Conditioning and Refrigeration program |