Show SPRING mm bmw DEVELOP 41 NT is WELL UNDERWAY in a short interview this morning with J E weston who Is in charge of range water development projects in this county under the taylor razing grazing act it was learned earned that ie jae on six sir new spring projects and one new range well had been recently started or will be started in a few days the spring development leve projects are at cane wash sri berins trout water spring trough water spring aprin sprin ruester spring and glorso canyon spring the well Is called tile the montezuma creek well wel an interesting and important fact Is that all the 1 above named spring development projects wil neel leei nee l no power lift for or the water as all will fow by gravity galvanized troughs tro nelis will hold the water for stuck stock use at listle spring which is now being worked the now flow of water has been dolibel do ubel this was dished by trenching drenching tren ching and thus concen colleen brating the low flow the present flow of all other aprin sprin springs gs to be developed Is expect el to be greavy areat y increased we understand that several grand bunty aprim sprin development projects will le be gotten underway aderway immedi atey engineer 11 II AV ott who is in harge of al range hana water deve develon lOll within the state is in toay and is expect el to arrive in 31 today or tomorrow |