Show N Y A bols MAKE EXTENSIVE improvements ON R H S CAMPUS I 1 A number of very noti noticeable ceab 10 improvements have been made recently on the campus of the roosevelt high school through a national I 1 youth administration project sponsored by the duchesne county school district don C sparks reported this wool week the work is directed by marion and the boys have widened cement walks made ready for the laying of asphalt walks around the building prepared seed beds for the planting of lawn and have recently planted lawn in front of the building they have also replaced a number of the evergreen trees on the campus which died and are now preparing the seed bed for lawn southeast of the building during the next few days four NYA boys now at work on the campus will prepare the foundation for a tennis court which will be completed in the spring last spring the boys straightened the irrigation ditch in back of 09 the school building and ch chena chEn n c 3 the sewer system on the west side of the building |