Show ROAD TO GRAND JUNCTION at last nights meeting 0 of the directors of 0 the chamber ot of commerce it was decided that work shall begin at once on the construction of the road into the uintah basin for which funds have been raised here recently that the road over the douglass creek pass may be completed winter weather interferes further work it Is roughly es tamatea that it will take from 60 to 90 10 days to construct the three miles at f new roadway necessary to get ver the pass in the book cliffs aorta from this city very little it any work will be re lulled on the 65 55 in miles I 1 le S of road be aaen this city and the toot foot of 0 the pass three miles of side hill con it ruction will begin at al t that point his bis mileage taking the road over the pass from that point a considerable amount of work will be necessary in going down douglass creek 0 o connect with the present ocean to o ocean highway at rangely langely Ran gely work on ahe road into the paradox Jl li strict will not be begun for a number er of weeks as work there can be carried on throughout all of the willer r mouths months the douglass creek pass ass may be blocked with snow for some three months of the year but he highway to the south will be pen ipen throughout all of the year work on the paradox road will bo bi belayed until after the visit hero here of J 1 I mullen beneral general superintendent ae f the standard chemical company who Is to pay this city a visit on luly july 16 as mr air mullen is thoroughly a with that district and ills his lavice will prove valuable in the oad work grand junction send nel |