OCR Text |
Show OIL NEWS Total depth of the Carter Oil company's .Bluebell Unit No. 1 well, located SW NE Sec. 6-1S-2W is 12,518 ft. 'Pressure back from 12,5U2-11,900 ft. with 225 sx. A drill stem test through an open hole between 11,138-12,518 ft, with packer at 11, 125 ft. in 7 in. casing, open 2 hours, had a fair blow initially and died, recovering 2010 ft. drilling fluid, very slight oil and gas cut. Pressure Pres-sure bacg total depth with hook wall packer set in casing at 11,-115 11,-115 ft. Open tool 11 hours before be-fore swabbing with fluid at approximately ap-proximately 8500 ft. Swabbed approximately 2 barrels water per hour, very slightly oil stained stain-ed 5,000 gals acid applied at 11,138-895 ft. Crews were preparing pre-paring to swab. A drill stem test at Carter's Duchesne Ute Tribal No. 1 well, SE NE Sec. 17-4S-4W. open 2 hours, showed a weak blow for lVz hours and died, recovering 150 ft. very slightly oil cut mud. A core at 4440-50 ft. recovered 10 ft. A drill stem test at 4425-50 4425-50 ft, open lVz hours, had a weak blow for IVi hours and died, recovering 100 ft. very slightly oil cut mud. A core at 4637-57 ft., recovered 20 ft. Crews are drilling at 4711 ft. Crews are clearing roads into the Jack A Burnett No. 1 well on Strawberry which has been shut down since early in December. De-cember. Crews at the Rockwood Brown No. 1 well, located NE SW Sec. 5-5S-20E, cored at 7430-45 7430-45 ft, recovering 15 -ft. A drill stem test was attempted at 1407-45 1407-45 ft., but packer failed. A drill stem test at 7415-45 ft also failed. fail-ed. Crews are drilling at 7639 ft. |