Show school board awards coal contracts several ellinor improvements Auth authorized prized for district contracts for furnishing coal for schools of the se savier vier district the district board we were warded awarded by of education following the open ing of bi bids ds at their regular meeting here monday A A B robinson of richfield was awarded the contract for redmond the salina elementary junior high and high schools glenwood the richfield elementary junior high and high schools and the district office chas F nielson of monroe received the contract for the monroe elementary junior high and high schools and the elsinore junior high dee southam of monroe recen received the contract for annabella central elsinore elementary and joseph lawrence foy of glenwood was awarded the contract for sigurd and aurora allen alien montgomery was awarded the contract for venice koos kooshak bar em and the richa richfield beld junior high shop at the same meeting the board awarded james levi leal arf of sevier the contract for hauling the first and second grade students from clear creek canyon to sevier lionel C payne vr was is given the contract to transport vermilion students by car to sigurd each contract calls for trips taps morning noon and night it was decided to have the koosharem Koo Hoo sharem bus start at burrville Burr ville this year instead of at greenwich numerous minor improvements were ordered or are already in process of construction A connection of the water system at central to supply water at the school building was authorized it was decided to paint the joseph school inside and out and to paint the woodwork on the outside of ol 01 the aurora building the interior having already been painted this year the work of painting the inside of the salina high school building is under way all roofs at the salina high shop junior high elementary schools and boiler room have been repaired during the summer new floors are ae being laid at elsinore and joseph facilities for storing band instruments and uniforms have been made on the stage at the richfield high school lorenzo peterson nu baa been awarded the contract to shingle the richfield junior high school building and A L knap bus to cals omine the inside of the building work is to be started immediately on shingling of the elsinore elementary building on the placing of diato on the steps at the monroe elementary building and the placing of rubber floor covering on stairways at the monroe high building A new drinking fountain has been placed in the ifon monroe e high gym and the have been extensively improved pumps for pumping water from basements of the buildings at venice and sigurd have been installed it was decided to purchase a piano for the joseph joeeph school |