| Show SEVIER COVE FORT ROAD co completed pl abed gravel surfacing widening to regin begin Sept september eThe r I 1 tor for the U S II 11 A gillis el engineer roads roada who was in bureau of public the stretch of widening charge chang of through tile the narrows in forest road through passed creek ca canyon nyon clear on his way to the our city thursday he stated the work of 0 office V ogden completed na narrows arrows was the widening added another 62 july 10 which the pik pikes es peak roa road A to ot of tine fine the miles 3 system h highway O ocean acan ocean to of tile the str stretch etch and gravel surfacing to the over the top cont continuing inking right mountain will begin of th the other side 11 he says september about completed in ill time to will be and road winter insure an all |