Show BIT ROAD commissioners SIGN SEV ERAL agreements FOR BUILDING HIGHWAYS I 1 road conditions condition are arc generally got good in the district visited the engineer reported and plans made for improvements salt lake city A operative cooperative co agreement providing for the construction of a strip of road between bridal veil tail falls falla and olmstead in utah county as a federal aid project was waa signed by the th state road commission commis alon and the commissioners of utah county the road Is estimated to cost of which will be furnished by the federal government and the balance by the county agreements were signed also by the commission and the federal bureau of public roads for the construction ot of the heber hebar froitland fruitland forest road route no 4 and tor for the survey construction construct lon and maintenance of the escalante widtsoe no 6 section of junction escalante forest highway the commission also entered into an agreement with the oregon short line railroad tor for the construction of a wooden box culvert under the tracks of the railroads evonda branch on the ogden hooper road the state Is to build this culvert and bear the expense of keeping it up ira R browning chief engineer ot of the state road commission and E C knowlton maintenance engineer returned am from an inspection trip thru sanpete San pete sevier wayne pluto garfield and kano kane counties they were accompanied on that trip by J E garn district engineer in that section road conditions are generally good in the district visited the engineer reported and plans were mado made tor for improving them in places it is expected that work of improvement will be agreed upon soon on oil tho atio gunnison levan road and sanpete county waa wa si reported anxious to obtain federal aid on the mt pleasant chester road the engineers discussed with the county commissioners of sevier county the improvement ot of the road south of joseph in that county and it was decided to make a survey over the road from elsinore Els lnore so that any improvements undertaken would be on the final location of the road |