Show new road will be built soon ogden n B ja J finch district engineer of the lie 11 II 3 bureau of public roads told of the exchange EX biange club that hint con construction on the tha road from frilly tile the end of the he avenue pavement to weber canyon would be andr way within thirty days daya will be C called for within ten days mr air finch sald said this announcement Is received with enthusiasm since this road will afton a fine lilg hwaT tor for tourists into ogden from weber canyon which Is a widely traveled road |