Show NOTICE TO WATER USERS the state of 0 ata utah office office of state engineer salt lake city notice is hereby given that lyle farrow summit utah has made application la in accordance with the laws 0 of utah to appropriate 15 see sec tt ft ot of underground water in iron county utah said water will be pumped from april 1 to october 1 inclusive of each year fro from a 12 inch well approximately I 1 ft deep located at a point N 1330 ft t and W 10 tt ft from the SIA SA cor see sec 2 24 4 T 3 34 4 S n R 10 W S L B al M and used to irrigate SO 80 acres 0 of land embraced in and SEiN WA ot of said see sec 24 this application Is designated in the office of 0 the state engineer as no all protests resisting t the lie granting ot of said application with reasons made in form must be filed with T 11 humpherys state engineer capitol building salt lake city with one extra copy and tiling filing tee fee within 30 days alter after the date of 0 c completion of publication T jr humpherys state engineer date ot of first publication september 10 1937 date of last publication october 8 1937 NOTICE TO WATER USERS the state of utah office ol of state engineer salt lake city notice is hereby given that U 3 forest service ogden utah has made application in accordance with the laws of utah to appropriate 01 see sec tt ft of water from rom larson lodge spring in kane county utah said water will be diverted from may hay 1 to october 31 inclusive of each year at the point 0 of issuance 0 of said spring which bears S 49 lag deg so 50 min E 4 1 I 6 6 it from the NW corner of see sec 12 T 38 S R 9 W S L B af M and pumped to a 1000 1000 gallon storage tank from which it will flow by gravity through a pipe line to navajo lake camp grounds and larsons bodga where it will be used by the public for or recreational and domestic purposes this application Is designated in n the office of the state engineer as aa no 1 2478 all protests resisting the granting of said application with reasons made in affidavit form must be filed with T 11 humpherys state engineer ca capitol 1 building salt lake city with one extra copy and filing fee within 30 days after the date dale of completion of publication T II 11 humpherys state engineer date data of first publication september bdate 24 1937 date of last publication october 22 n |