OCR Text |
Show TO CLOSE CANYON ROAD EARLY IN WEEK The Ogden canyon highway win be losed to tra'flc during the early part of tho coming week while a tern- ' porary structure Is being erected to1 ' an.lle the traffic during the pt-rlod required ffr the construction of the new SSO.OOO bridge at the mouth of, the canyon. This was announced to- day by I Ira Pundy of the firm of I Ivroft and Bundy, contractors. Designation Of the period during which the rnad will be closer) will bo announced Saturday. The highway will be closed f rom ' three to five days. |