OCR Text |
Show II STORM SEWER I MAYBE BUILT City Commission to Look! Over Ground in South Ogden Members pf the oitj and count commissions com-missions win visit the southern section of the cltv Monday to look ov er the proposed locations of xtorm newer 9 hlch mny be Installed during the summer to take care of the surplus waters of Burch and Sullivan oreeka, which cause floods In that Section each spring. The Installation of the storm j sewers has been practically decided upon after several other methods of disposing of the water have failed. "Work dono by the city Inst sprint; and winter in an effort to prevent the Mood cost approximately 52.000, it was V eald. |