| Show PORTION OF PIPE TO BE CONCRETED LOGAN Sept While Lo Logan an city's main water supply line In Lo- Lo Logan Logan gan canyon Is In good condition a a. test will be made this year as to the advisability ot of covering the en- en entire entire tire pipe with reinforced concrete Within no a few weeks Thomas Da La Mar of Tooele will place a reinforced concrete covering over a a. section of the pipe line This section Will be ex- ex examined next spring and the results of the test will Ill be recorded |