Show FAIL TO DECIDE ON ROCK SOURCE from There were no definite results the Inspection Friday of ot quarry sites in Ogden and Weber canyon for ma- ma material with which to pave pa the Uintah road Further inspections will be made Inspection was also made of the Uintah road which was constructed last summer and ad a d which is ts now nov to have ha penetration macadam surface Preliminary work wort Is under way but the paving work will not be carried on until the material has been select eden selected ed and the plant has hs h s been to Contractor c Ora O Bundy Those who Tade the UlC Inspections were LeVI Muir testing engineer for forthe forthe forthe the state highway commission B. B W. W of Matteson senior highway engineer the U. U S. S bureau pt pf public roads and Walter S. S Craven Crven engineer for Mr Bundy Mr Bundy who Is 15 In Idaho is ex expected e cx- cx here ary here nert next week wed wee and will tIl then give personal supervision to the paving project |