Show TRACK WORK STOPPED judge howell hovell had a subpoena issued for engineer parker work of double tracking sixteenth street was stopped for a short time last night by the city engineer at the request of judge howell who found the track nine inches above the curb instead of five at an increased expense the street car company will continue laying ties and rail rails but at a different grade judge howell passed along the street yesterday afternoon his ills attention was drawn to the elevation ot the track already in service which seemed inches above the regular grade of t the he high highway A subpoena was Is sued for A F parker city engineer who on measuring me found the track to he be four inches above the level of the road as established at the time it was graded and repaired notice was at once served on the company and work was stopped until a new grade could bo be located compliance with the order df the court means that the company will be compelled to tear up the track now in service along fie vie street and do over again aguin the work accomplished on the new track in order that might not be completely cut oft off from the canyon line it Is tho the intention of the company to hastily construct a new track at the proper grade before the order is given to lower the old |