Show PIER COLLAPSED AND WORKMEN KILLED I 1 superintendent OF construct CONSTRUCT TION CAUGHT LN N WRECKAGE was warning the Emp employed loyes that tha the piling was sinking and anti thera there was danger baltimore april 27 A section a of feet of the new now pier being erected at ahe the emigration station at locust point south baltimore tor for the baltimore ohio railroad tor for the use uso of 0 the north german lloyd steamship company collapsed today carrying down between twenty and twe twenty nty civo workmen of whom alx arc are known to be dead three missing and fifteen in jurod IV W N edon edson general superintendent of the baltimore bridge dridge company who had charge of the th steel construction was caught while warning tho workmen off the pier the dead tony wolf robert sweetman four unidentified men drowned the pier Is a two story structure turo 1000 feet long its estimated cost Is warning of the di disaster imster wig had several days ago when some of tho the piles began settling today shortly before the disaster the piles settled in such an alarming manner that orders to leave the place were sent out bout it is due to tills fact that tho the casualties were not greater those caught were at the end of the pier upon the roof later this afternoon a revised list of the missing was issued placing tho the number of accounted for at sixteen most of them laborers it was further stated that only three bodies have been recovered all of which have been identified howard T ellander of baltimore was one of the dead he loat lost his lit alto trying to save the men upon tho the gutc end of the pier superintendent edson who was injured aured in tho the performance of the same service was not seriously sario naly hurt |