Show SOUTHERN UTAH OIL WELL PUSHING TEST AT CANE reports from the cane creek oil companas comp anys well on the cane creek ant anticline leline down the colorado river indicate that the drillers drillars dr illers have succeeded in effecting a shutoff of the water leak left from the first cement job drilling out of the cement in the casing has been completed the tools ar are now working on the 45 foot plug placed in the bottom of the hole to control the strong showing of oil and gas which had handl hand capped previous cementing operations the hole is bottomed in black sandy shale at feet and the ca casing sing is set at feet the local management of the company Ls Is confident that the showings encountered n in sands between and bottom should result in commercial oil production it if the water problem Is solved the well will be drilled in after the bottom plug of soft rope Is drilled out much interest is being ds played by the ibcal oil fraternity Mity in the result of flie fhe 11 ol 01 II tes t moab times independent |