Show Renewed Gym Attracts Utes BY JERRY MURRAY With the remodeling job the university is now available to students for all types of indoor Highlighting the the basketball court in the main gym has been completely New bank-boards have been installed and the playing floor has been to accommodate two games at the same A net separates the two cross which are of regulation the floor is the same length as the fieldhouse In a new pool for women students is nearing The men's still under is being completely wrestling and have been remodeled to better accommodate the team as have the women's dancing Clumsy halls have replaced by convenient Old rooms in the building have been completely refinished and two new class a seminar two special activity rooms and a study for physical education students have been Completion of the swimming pools is expected within a |