Show THE U u. u P PI BOARD IS ISTO TO SCAN BASIN BASli PROJECT The Tho Directors are to Meet 1 in New NewYork NewYork NewYork York This Month and und in Los Angeles in August August August Aug Aug- Decision will be reached by the tho Union Pacific system and and the Salt Sait Lake Route as to the building of ot the Uintah basin line at a meeting to be held In Los Angeles In August Prior to that time directors of ot the Union Pacific system will wm meet in New York when the reports of ot the engineering corps in the Uintah basin basin basin ba ba- sin will be presented and an appropriation appropriation appropriation made for Cor the building of ot the line if it R. R S. S Lovett chairman of the board decides the Uintah branch would be self Tho The three preliminary reports of the engineering department of the Salt Lake Route are now in the hands hand of the board of ot directors and it ia is said that surveys on the tonnage cost of construction and ald the estimated ed revenue of ot the proposed line are favorable to its construction The first corps of engineers has haa been into the heart of ot the Uintah basin and has secured figures as to the Incoming and outgoing tonnage and also as to the possible tonnage if it the resources of the basin are developed developed developed de de- to the maximum degree by bythe bythe the building of a railroad in this section It Is said the engineers engineer found the greater part of the tonnage tonnage ton ton- nage coming into the basin came from Colorado points on account of better rail rall and stage connections and andt t is the intention to divert this tIt traffic to the Utah distributing If It the Union Pacific system determines determines determines deter deter- mines to build at once o 0 o |