Show DRAINAGE NOTES Progress of Work Vork ork on District No a 8 During the month of October the drag lines two In number excavated cubic yards of dirt which is a s somewhat less than the amount excavated in the month of September Septem Septem- ber due to some difficulties on the C line Une going thru the lake Just west of Flints Flint's place and also In moving from the C 0 line dine to tho the C 0 line The C 0 open drain or the main drain on the C schedule has Its outlet into an old river channel at atthe atthe the west VI IA 4 corner of Section 8 Twp 16 So Range 8 W. W runs southeast- southeast to the northwest corner of Sect 15 thence due along the Woodrow Woodrow Wood- Wood row road for tor 3 3 miles thence south Vz mile thence east mile ending H 14 mile west of the railroad The on op this drain at the 1st let of this month was about 1 1 mile west westI of the railroad and will complete the drain within a a. week C open drain Is the drain 1 I miles west of Abraham running north with the C drain This open drain was completed last month C has its outlet Into the C drain at the north r IA corner of Sect 14 and runs in a southeasterly direction direction di direction di- di winding up at Fullmer's In Inthe inthe inthe i the southwest corner of ot Section 24 1 This drain will be completed within the next few tew days from whence this this' machine will move to the C GOO drain where it ft has 1 miles of ot open work All of ot the open drain work In this district will be completed this month The tile machines are now working on what Is known as the E schedule schedule schedule sched sched- ule In the extreme north portion of ot the district These machines are moving in a southerly direction and andare andare andare are all expected to be working In Inthe Inthe inthe the vicinity of within the next few days Progress of ot work In Inthis Inthis inthis this section of the country has been somewhat slow due to the soil condi condi- I |