Show Chips of j y The N New en I According According to the contract the new museum building building building build build- ing ing- now in course of construction was to have been completed by November November November No No- vember 1st But in prosperity prosper prosper- ity y of the time there have been so many new buildings building erecting erecting- in Salt Lake City this summer that it has been impossible impossible impossible im im- possible for contractors to secure enough skilled laborers and plenty of the better sorts of brick and stone As Asa a result construction has been delayed not only at the Uni University University ver- ver sity but over the entire city It is possible therefore that the museum building building- may not be ready for use until until until un un- til a week or two after the Christmas holidays f This building which will be somewhat somewhat somewhat some some- what larg-er larg than the library building building- will have a large auditorium on the third floor with a comfortable seating seating- capacity of at least Nothing Nothing- isso isso is isso so much needed at t the University as such an assembly room the seating seating- capacity of our largest est room now being being being be be- ing ing- only It will also have a gymnasium gymnasium gymnasium gym gym- room and will afford classrooms classrooms class classrooms rooms laboratories and museums for forthe forthe fortl tl the departments department of of biology and and g g- ol oP ogy including mineralogy t- t ly relieving the 1 crowded tro ded conditions in the library building The The new new shop building is ex q 4 to be be finished by November 1st Tl iB iA will afford very great relief from the inconvenient quarters of machine and shop work now crowded in into to the physics physics physics phy phy- and chemistry departments of the phy physical ical building g. g JO r N |