Show sr OST-sr BOSTON ACTIVE CIl Mine lle 1111 Mill 11 n itt lt Xu Non In Op- Op ermit t Ion Inu Mercur March 27 The The 7 The boilers boier at atthe ot the Sunshine Boston mine and mill mm were warmed up yesterday esterday and b by night tho the hoisting plant was wan raising tho the gold Jold bearing rock from the underground workings Some Som ore Is II being treated now Within a 0 fow low days It is expected that everything will wil bo be 10 running at full tuu blast l and und tho time second big gold producer producer pro pru- ducer lucor of or th the camp will wil bo ho forwarding tho time yellow metal direct to the government government govern govern- ment I n office In Salt Sni Lake John Martin MarUn la is 1 the mine superintendent superintend superintend- ent eat and George W. W Wood 1001 has haM charge of or ortho tho the milling plant The Tho reduction works are aro capable of treating tons of ot oro orum dally daily and enough low grade grado gold old bearIn bearIng bearing bear- bear In Ing rock Is blocked out In the mine mint to keep the operators operator profitably employed 11 for a number of years to come core |