Show l AT tl WORK OHI O O. I 5 0 50 0 CTt cut N Pt Sinned fur lur furOne hIgh Grade r t 1 One of tho the important events o of ot tho wC week k relative to the operation of ot tho the Prince Consolidated mine wan 1 the cutting cutting cut cut- ting of ot a station on the foot toot level Jevel n nt tho tIm starting of a crosscut 1 towards the tho thC rich fissures fissure says say the lec- lec Rec Rec- ord The Tho progress of 0 this thi work will vilI be watched with rUh wih keen Interest for when wil the fissures are encountered there win will he be another 0 feet of or backs on the tho high grade shipping ore Fro Superintendent William Lloyd LloydH It H L Is learned that the No So 1 fissure on I th the lh level ll le in Is 11 looking extremely well cl I with wih a a. a showing of or silver led lead tl oro ore that runs run up Into the tho pictures picture On th th j work vork Is progressing nicely In the lh luo being lell stink unk to connect connot with will wih the and Oll every overy ery pound of or ore extracted l I. I high grade material A ralso is 18 also alo being made on the th same aam level hovel on tim the No Xo 1 f insure about 30 feet west rom from coin the Ihl shaft an and It I. I too Is hi being run in iii 11 h grade raue shipping ore I 1 It I will wi probably take anywhere from Crom 40 4 to GO CO to complete completo tho the crosscut on Cn the 60 level to connect with the I tie No Xo 1 fIssure |