Show I Workers Making laking Improvements At I Navajo Lake Lal Dike DikeA A crew of workers has been assigned to a project of Improvement improvement improvement improve improve- ment on the Navajo Lake dike to protect the dike from damage during during dur duro ing the winter months and during the high water period of next spring according to Blaine Beten- Beten sen Dixie Forest Supervisor The dike proper is to be raised approximately two feet but this will not Increase the amount of water stored in the lake since the spillway Is to be left at Its present leelA level le A new emergency spillway is to tobe tobe tobe be constructed so that if for any erosion the run-off run spillway becomes clogged the water may still escape avoiding the danger of a break In Inthe Inthe Inthe the dike In addition steps are to tobe tobe tobe be taken to prevent boats or logs from damming off the regular spillway Posts will be set in the lake circling the spillway so that any floating object will be stopped before it reaches the spill Heavy rip-rap rip approximately three feet deep is to be Installed on the lake side of the dike as a means of protecting It from washIng washing wash wash- Ing or cutting away by the constant constant constant con con- stant lapping of waves |