Show R RESERVOIR SER BUILT AT ZION On April 1 15 the new gallon gallon gal gal- lon Ion water tank at ZIon National Park will go into Service At the present time all work has been completed except for backfills and a thorough h cleaning of the inside of the tank Begun last September this project consists of a 11 50 by 00 by It U foot concrete tank set under ground and covered with five inches of re reinforced concrete and eighteen Inches of earth Owen A. A Johnson and John II H. Dooley were the foremen in charge of this pro pro- As AI a companion project tto the water tank a six inch fire line has been completed This water line has been built by CCO enrollees under the direction of foreman John E. E Excell Excel and is so constructed construct construct- ed as to give fire protection to the residential and utility areas of the park |