| Show ty Test Well Produces Gallons a Minute to other er r test of the city well drilled S the tile canyon was made Sunday with n r unsatisfactory results After Arter a aI aei ans ei I ns was made last week and only j oo gallons per minute obtain obtain- Ithe the well wll was drilled from a depth In 71 feet leet to feet but little adI adwater adwater ad- ad I water was obtained v vy y it is thought that with ad- ad cal calC perfections in the well the C i could be increased to at least pilon per minute enough to ass as- as s the city of plenty of water bether or not the flow is Increased I water rater will be put into the system the he earliest possible moment to top p cue care of the shortage In the supply k the present shortage prevailing gallons per minute will wID y relieve the situation 1 will require the laying of only MO StO feet of ot pipe pipeline line to put the ther 1 r Into the system |