Show sioux I 1 ready to drift 11 e station L poll the foot level of the sioux cons mine has been corn cont plated and tl e V sinking of the shaft will also be started again within the next day or two drifting tow ard the oie 01 e upon the foot level the station has just been cut out will also start at once the machine drills will be used in lit tile the shaft and tl en while the sl aft is being cleaned out the ma c dires ires will be switch ed to the drift B 0 clanging about in thia this manner 1 tame it t la is thought tl on lit that it will require about fifteen day das s to I 1 jut ut the shaft down to the next le el and perhaps the same length of time to run the drift in to the ore and then the new will be installed an I 1 the shipment of ore started in earnest |