Show ready for work bunday 1 morning G grand and central will start breaking ore contract I 1 with ith new smelter col C E loose manager of the J central mine was in the dis ri an n wednesday and that ha na chinery is fast being put into for the reopening of the berty the air pipes shaft tim ies etc are being thoroughly in 1 led ted and next sunday a bunch of miners will be put to work in the nine mine and from day to day the force w inci increased eased until the full duoto of I 1 m men en is again at work underground ith cw tt le e contract conti act which the grand oen cen trel made with the new tintic gintic smelter calls for the delivery of the ore to the ore or T bins at robinson and the routing of bouhe the ore to the smelter is left entire 13 lilith aith the smelter people at the present time mr knight the pal owner in the railroad and smelter does not intend to extend his railroad I 1 fo to the grand central ore bins if the slig R rag W ry will treat the new smelter iter right he will give them the contract for hauling the grand cen aral ore and also the lime rock from the eureka swansea extension MT M loose lose like many other gintic tintic mine owners is very enthusiastic in his praise for uncle jesse knight who is doing such splendid work in behalf of the entire district and states that he stands ready at all times to give him all the assistance possible |