| Show installing new engi engine ne the new engine for the bay ra mond Il linious property has been hauled up to tie vie mine and manager J 0 sulli van expects to have it in working order within the next ten ton days then just as soon as the cage and cable can be fished I 1 out of the sump below the 1500 level the mine will be ready for business again when the engine was wrecked a couple of weeks ago the cage and cable dropped to the bottom of the shaft the 2000 feet of cable will probably have to be replace ed |