| Show electric hoist in place 1 ho electric hoist la now in place at while there isa little cuore to put in proper oriel bupt supt giggs to te able to commence sinking next monday electrical for the will be ready by when the will be tried out the humbug ground was never ex elored much 1 elow the tunnel level and the sinking of this shaft will be w arched with u demable in son e time ago U shift was ut down a distance of il out 10 feet lelow the tun nel and it vas foi the pur ose of 1 ing this shift 00 or possibly feet birthel tl at the electric hoist ani ur chased 1 he hoist arrived from den ei one eek ago ind no time as 1 t in installing it an electric hoist will prove i access at the humbug the workings are up high upon the de of the mountain where it is a hard mitter to secure coil or water both of which will ie unnecessary where electricity it in use la the first ele u haib lobe in stilled 11 the cintio district 1 helea sers at the bullio i beck mine received their checks last saturday |