OCR Text |
Show Page Eight - The Eureka Reporter - October 10. 2003 LEGAL NOTICES Methamphetamines cause problems in rural America Oklahoma, along with many other states west of the Mis- sissippi River, has become overrun with metham-phetami- ne This investigation was called Operation Northern Star and it ended up targeting six executives of pharmaceutical companies from Canada that all sold bulk quantities of pseudoephedrine to meth manufacturers in the United States. The methamphetamine epidemic in rural America has many law enforcement officials, drug treatment centers and citizens of this great country baffled. Even when these labs are Many people that have come in contact with meth ad- gerous Drugs, said bold approaches to the problem are needed. Wright suggested expanding treatment programs and placing tighter controls on common cold medicines containing pseudoephedrine, the chemical most used in meth manufacturing. Evidence of this opposition MINING DEPARTMENT OF NATURAL portation of pseudoephedrine. and is overwhelmed the task with of fighting the epidemic. With over 1,000 meth lab busts in each of the last two years, law enforcement officials have their hands full The easily obtained ingredients to manufacture Crack (another name for meth) and the mobility of the labs make it difficult for law enforcement officials to track down a high percentage of potential busts. tracked down and the manufacturers arrested, the toxic chemicals used in the process are hazardous and cost thousands to be properly disposed of. In an AP article released last month Lonnie Wright, director of the Oklahoma State Bureau of Narcotic and Dan- BEFORE THE DIVISION OF OIL, GAS AND came in the Drug Enforcement Agency's international investigation targeting the illegal im- RESOURCES STATE OF UTAH IN THE MATTER OF TENTATIVE DECISION TO APPROVE A REVISED LARGE MINING RECLAMATION AND PLAN FOR ASH GROVE CEMENT COMPANY'S NIELSON SANDSTONE MINE, JUAB COUNTY, UTAH. NOTICE OF TENTATIVE DECISION TO APPROVE pre-stripp- ed and stockpiled for reclamation. When the pit limits are reached, the pit will be graded and reclaimed. Pit 2 will be mined in a similar manner, but as a repeated single bench operation. Mining of a single level will be completed before the next level is developed. mining phase is completed, the mine phase will be contemporaneously reclaimed to meet the land use. At the completion of all mining, the site will blend into the surrounding topography. The fipost-mini- sub-drille- d, www.metham-phetamineaddiction.co- m state-of-the-- art Crutchfield; Phone (435) 40-8-1- FOR CITY COUNCIL EUREKA People For A Better Government ' . DATED THIS 3RD DAY OF OCTOBER, 2003. STATE OF UTAH, DIVISION OF OIL, GAS AND MINING. Lowell P. Braxton Director Published in the Eureka Reporter, October 10th, 2003. NOTICE OF MEETING CHANGE TINTIC SCHOOL DISTRICT BOARD OF EDUCATION Public notice is hereby given that the location and the time of the October 2003 meeting of the Untie School of Education has been Board changed to the following: October 27, 2003 Date: Location: West Desert High School 440 Trout Creek Trout Creek, UT 10:30 a.m. Time: By the order of the Tintic School Board of Education. Jeremy Snell, Business ministrator Ad- Published in the Eureka Reporter on October 10th, 2003 Factory Authorized Dealer & Service Center Chain Saw Sharpening and Repairs 8. 1, Paid for by 857-121- 2. Ash Grove Cement Company is fulfilling obligations under the Utah Mined land Reclamation Act of 1975, Reclamation surety will be inUtah Code Ann. crease and provided to the DiAny person or agency agvision for the proposed project grieved by this tentative decidisturbance. The operator will sion to issue approval is employ the following mining hereby requested to submit and reclamation techniques on written protest within thirty approximately 132 acres of (30) days of the date of publication to Mary Ann Wright, federal, and state land. During Operations: The Associate Director of Mining, Nielson Sandstone mine beDivision of Oil, Gas and Minin and has 1987 ing, 1594 West North Temple, gan operation as a Suite 1210, Box 145801, Salt conventional, operated single bench, open pit mine. Lake City, Utah 84114-580The proposed expansion of setting forth factual reasons the Pit 1 will continue to be for the complaint. If no remined using a single bench sponsive written protests are ' approach'. As a hew pit area received by the Division within Ash Grove Cement Company has submitted a permit application to expand their existing large mining project. JUJUr2)ul final ng nal mine slopes will be reTHE STATE OF UTAH claimed at a 3H:IV slope. The dicts feel that full rehabilitation TO ALL OPERATORS, pit bottoms will be is impossible for them; that the TAKERS OF PRODUCthen ripped and damage is permanent It is true TION, MINERAL AND the previously stripped soil will that the toxic chemicals used ROYALTY OWNERS, be redistributed on these arto cook meth are extremely eas. AND PARTICULARLY hazardous and one could cause ALL PERSONS INTERAll roads within the pit arpermanent damage, but if ESTED IN SECTIONS 1,11 eas will be reclaimed followcaught early enough and if the AND 12, TOWNSHIP 14 ing mining. Some roadways in right program was used, the SOUTH, RANGE 3 WEST, the mine area will remain folindividual can be restored. SLBM, JUAB COUNTY, lowing mining to provide acThere are hundreds of UTAH cess to BLM grazing land former meth addicts that are Notice is hereby given by north of the mine and to allow now living healthy lives again the Division of Oil, Gas and periodic inspection of the site because of Narconon ArrowMining of its tentative decision to evaluate revegetation suchead. To find out more about to approve the Large Mining cess. crack or the Narconon proThe mined area will be Operations Notice of Intention to Revise Operations for graded to approximate final gram, visit today Ash Grove Cement contours, then reclaimed usor call surface Company's Nielsen Sand- ing stone Mine. Mining activities roughening and revegetation will affect the following area: techniques. All seeding will SWV4 of SW4 of Section 1, take place during the fall of 1 1 EVi Section the year that reclamation is , and the NWV4 of NW4 of Section 12, performed. The person representing Township 14 South, Range 3 West, SLBM, Juab County, the company is Mr. Duane 0 30 days after the last date of publication, the tentative decision of the Division will be After Operations: As a NO.M023012 Utah. o is disturbed, soils will be Carpenter Seed Company 1030 So. State Provo, UT . . 373-374; 0 |