Show A STITCH IN TIME at this time ot of the year the city cabi can undoubtedly save money time and inconvenience by giving the city a number of assistants in keeping the baer ditches clear ot of leaves and other rubbish which clogs the way away and causes the water to overflow the streets and sidewalks thereby doing damage which sometimes takes days lor for a number of men and teams to repair it is almost a dally daily occurrence for the ditches to overflow their banks and it only take a few moments for water beyond its bounds to make excavations gullies mud puddles and the like in the streets and on the sidewalks and the worst feature Is that the dama gethus done often goes tor for years before it Is repaired A little littie extra help in the Water masters department overcome all this expense and annoyance |