Show SURVEYS OF reservation KE SOON TO BE COMPLETED so far as the office of the surveyor or general of utah Is concerned all work in con connection neAlon with the reservation haa has been finis for two months nio athe tho the surveys sur ays eys were forwarded to washington on Do december cember lait end and 05 por per cent ht or f them hato have bean been approved althis at abia battha rats the work of checking up will hab been completed in eix six week weeks there ure tire one hundred and twenty eight townships in the reservation and the survoy surveying ing was dono done by contract eighteen contracts were let the first work having boon been done late in august 1903 there yet remains tho the laud to the nine hundred head heads of indian to to bo be completed As t how far yule this work has progressed 9 no definite information Is to bo be had |