| Show the great foot tunnel at the head of the rio bio verde canil in the daft river A T valley will be completed if nothing interferes within the next week this will remove the chief ob stacle on the line of too toe canal of which some acme twenty miles have been completed there are however some intervening ter gaps gapa to be excavated and work on the dam dain now DOW waiting for low water to be executed the upper portion of the canal covering paradise lee valley will probably go into corn com mission in time for the next cropping season |